Major Equipment & Systems Include:

  • Nine (9) HVAC Systems
  • Purified Water, USP System (25 GPM)
  • WFI System (80 ºC Loop at 2.5 GPM)
  • Eight (8) 1,000 liter Process Tanks
  • Building Monitoring / Control System
  • Two (2) Pure Steam Systems
  • Four (4) GMP Autoclaves
  • Compressed Air System
  • CIP / COP Systems
  • Downstream Process Control System (PCS)
  • GMP Process Gas Systems (Sparging)
  • Small Equipment Washers
  • Process Waste Decontamination System
    (3x 1,500 liter)



Facility Utility & Support Systems Include:

  • Redundant Boilers
  • Multiple Chiller Systems
  • Dual Compressors
  • Two (2) Emergency Power Generators
  • UPS & Emergency Power for Critical Equipment
  • On site Facilities Department